Ganesh Multitech EngineeringGANESH MULTITECHENGINEERING PVT. LTD.

Topic hub · 10 guides

Surface treatment and powder coating

Coating failures are rarely the powder's fault. They are usually a cleaning, rinsing or conversion problem that happened before the part reached the booth. Ganesh runs seven-tank pretreatment, a 16 ft by 16 ft shot blast chamber, an 18 ft by 14 ft powder booth, a wet paint booth and a curing oven in-house. These guides cover each tank, degreasing by substrate, phosphating, powder versus wet paint, DFT and adhesion testing, and diagnosing blistering, pinholes and creeping corrosion.

Guides in this topic

Seven-tank pretreatment, phosphating, shot blasting, powder and wet paint selection, film thickness and the failure modes that show up two monsoons later.

Seven-tank pretreatment line at the Ganesh Multitech paint shop, with parts racked for cleaning and phosphating.
Coating10 min read

Degreasing before powder coating

Why degreasing decides powder adhesion: what has to come off, how a seven-tank line works, rinse conductivity, film build, cure and the failures it prevents.

Read

The Ganesh engineering note

One useful email a month

Drawing checks, tolerance tables, coating failures and sourcing costs, written by the team that runs the plants. No daily drip.