Press tool maintenance records: what a die history needs
What a press tool maintenance record must hold: stroke count, grind depth, clearance, burr reading and spring changes, and how each entry prevents a die crash.
Topic hub · 28 guides
Buyers audit a system, not a brochure. This cluster covers how Ganesh runs its plants: the ISO 9001 and ISO 14001 systems, in-process inspection, calibration and gauge control, pretreatment chemistry, the effluent treatment plant, maintenance, energy use and scrap recovery. It is written so a supplier-audit team knows what to ask for and what good evidence looks like.
How the plants run: quality systems, inspection, calibration, pretreatment chemistry, effluent, maintenance, energy and scrap.
What a press tool maintenance record must hold: stroke count, grind depth, clearance, burr reading and spring changes, and how each entry prevents a die crash.
Most packaging damage in transit is decided in the plant, not on the road. How to read each dent, scuff and crack, and which packing decision caused it.
How to read a 480 h or 720 h salt spray report: scribe creep in mm, blister size and frequency, rust area, and the limits to write on the drawing.
What a paint shop effluent treatment plant actually receives, the chemistry that removes phosphate and zinc, the numbers that size it, and the records an auditor reads.
Why fixture wear plates and locators are consumables: wear rates, the 0.1 mm repeatability budget, inspection frequency and the record that catches drift.
What each of the seven pretreatment baths actually does, the titration and contamination numbers that hold it, and when a bath should be dumped rather than topped up.
Gauge selection is arithmetic: resolution at a tenth of the tolerance band, uncertainty at a quarter. What fits a ±0.5 mm call, and where a caliper stops.
Drag-out sets rinse consumption, and conductivity proves the rinse works. Rinse ratios, the two-stage counterflow that gives 99% removal, and limits.
A first article proves the process can make one conforming part; sample inspection proves a lot matches an agreed defect rate. The numbers behind both.