Three facts that decide this page
- 304 work-hardens as it is cut, formed and welded, so the second bend needs more force than the first and springback is higher than CRCA at the same thickness.
- Seven-tank pretreatment, a 16 ft × 16 ft shot blast chamber, an 18 ft × 14 ft powder booth and a curing oven sit in the same plants as fabrication, so a part is not shipped out and back for coating.
- The passive oxide layer that makes stainless corrosion-resistant also makes it hard to adhere to. Mechanical keying by blasting, plus a conversion coating designed for stainless, gives the powder something to grip. Coating also hides the material, so any spec that depends on visible stainless must be settled before finishing.
What changes when you powder coat stainless
The passive oxide layer that makes stainless corrosion-resistant also makes it hard to adhere to. Mechanical keying by blasting, plus a conversion coating designed for stainless, gives the powder something to grip. Coating also hides the material, so any spec that depends on visible stainless must be settled before finishing.
The commercial consequence is that stainless is priced on its own material line, not blended into a steel rate. Material grade, thickness, tolerance and finish are quoted separately from conversion, so a change of specification is visible in the price.
Tolerance, edge and finish
Ganesh quotes to the drawing first and to ISO 2768 general tolerances where the drawing is silent. For stainless powder coating, the practical starting points are in the table below. They are starting points, not a guarantee: the part geometry, thickness and fixturing decide what can actually be held, and the quotation states the tolerance offered.
How Ganesh runs this route
Film thickness is specified and measured, not guessed: 60–80 µm is the usual architectural range and 80–120 µm is used where impact or corrosion exposure is higher. Stainless must be cut with high-pressure nitrogen to keep the edge oxide-free; that is the difference between a weldable edge and one that has to be pickled. The route is quoted as one sequence so the customer does not have to coordinate a cutter, a former, a welder and a coater.
When powder coating is the wrong route for stainless
Coating stainless simply to protect it is usually unnecessary and can create a maintenance liability if the coating chips. Specify coating for colour, reflectance or chemical barrier, not for corrosion.
A manufacturability review before quotation is the cheapest place to find this out. Send the drawing, material, finish and annual quantity and the review comes back in writing.
Typical parts
- Coloured architectural trim
- Low-glare panels
- Equipment covers
- Signage frames
Decision rule: when to choose powder coating
Specify powder where you need a durable, single-coat finish with good impact resistance and a wide colour range. Specify wet paint where the part needs a very thin film, a metallic or special-effect finish, or a touch-up-friendly surface. Specify blasting plus a zinc-rich primer plus a topcoat where the service environment is C4 or C5 under ISO 12944 and the part cannot be re-coated in service. For stainless the practical constraint is contamination: carbon steel tooling, brushes and blast media transfer free iron, so stainless work is kept on dedicated tooling and its own handling. Stainless raises the stakes on the decision: tool wear, gas cost and slower forming mean the volume needed to justify a tool is higher than for CRCA, and the wrong early choice is expensive to reverse once a die has been cut.
What to put on the drawing
State the powder type, the RAL or approved sample, the gloss level, the film thickness range, the masking requirement and the tests expected: adhesion to ISO 2409 or ISO 4624, and salt spray to ISO 9227 with the hours stated. Say what must remain conductive. A coating specification without masking and DFT is a colour request, not a specification.
Quality evidence and inspection
DFT is measured on the production part, adhesion is checked on a sample, and colour is compared against the approved standard under a defined light source. Cure is verified against the powder supplier's window. Coating records sit with the batch, and the pretreatment chemistry is monitored per shift.
What drives the cost
Cost splits into pretreatment, powder, masking, rack loading, cure and inspection. Pretreatment is priced by area and batch; powder by area and film thickness; masking by feature count. A heavy assembly can cost more to cure than a larger, thinner panel of the same area, because oven time follows mass. On stainless steel, material is quoted as its own line at the prevailing rate for the grade and thickness, so a change of specification is visible rather than hidden in a blended rate.
| Specification | stainless steel powder coating | Ganesh limit or note |
|---|---|---|
| Grades | 304, 304L, 316L to ASTM A240 / IS 6911; 430 for some trim | Grade per drawing |
| Thickness | 0.5–6 mm sheet; cut and formed to 10 mm | Seven tank: degrease, rinse, derust, phosphate, rinse, passivate, dry |
| Tensile / property | 520–700 MPa typical for 304 | 7.90–8.00 g/cm³ density |
| Grade | 304 / 304L / 316L | 316L where chlorides or washdown are present |
| Work hardening | High | Bend sequence and tool radius set from trial, not assumption |
| Laser assist gas | High-pressure nitrogen | Oxygen leaves an oxidised edge |
| Powder coating | Seven tank: degrease, rinse, derust, phosphate, rinse, passivate, dry | Chemistry monitored per shift |
| Tolerance basis | ISO 2768-m unless drawing states otherwise | Critical features inspected |
| Finish | 2B, No.4 or brushed; coating only where specified | Specified per part |
Sources and review
- ASTM A240 — Chromium and chromium-nickel stainless steel plate, sheet and strip · reviewed 2026-11-03
- IS 6911 — Stainless steel plate, sheet and strip · reviewed 2026-11-03
- ISO 8501-1 — Preparation of steel substrates · reviewed 2026-11-03
- ISO 2409 and ISO 4624 adhesion testing · reviewed 2026-11-03
Combines Ganesh machine limits (Seven tank: degrease, rinse, derust, phosphate, rinse, passivate, dry) with stainless steel grade and property data. The "what changes" section is written for this material–process pair and is not reused on another page.
Send the drawing and we will check the route
Material, thickness, tolerance, finish and annual quantity are enough for a manufacturability review. Tooling is quoted separately from the piece price.
Request a quote