Key takeaways
- ISO 3834 has three levels of control, and part 2 is the comprehensive one; it does not set an acceptable undercut or a test percentage, so pair it with ISO 5817 and a stated inspection extent.
- One WPQR on a 6 mm test piece usually covers 3 mm to 12 mm under the ISO 15614-1 thickness rule, which turns six procedure tests into two for a three-thickness product family.
- A welder's ISO 9606-1 certificate stays valid for two years only while the employer confirms every six months that the welder still works in that position and process.
- Ask for the WPS number, the WPQR report, the welder certificate and the mill certificate per heat; the ISO 3834 certificate alone does not tell you that your part was welded under any of them.
- ISO 3834 covers fusion welding only; resistance spot welding falls under ISO 14554, so a spot-welded enclosure needs a second requirement in the purchase order.
A purchase order that says "ISO 3834 certified" tells you almost nothing about the part you are buying. The certificate states that a fabricator has a welding management system. It does not state that your joint was welded to a qualified procedure, by a qualified welder, on a calibrated machine, with material traceable to a heat number. Those four facts are what the standard is actually built to produce.
ISO 3834-2:2021 is the comprehensive part of a six-part series on quality requirements for fusion welding of metallic materials, and it applies to work in a workshop or at a field installation site. It has no acceptance limits and no inspection percentages. It sets out what a fabricator must control so that the weld promised on the drawing is the weld made on every shift.
The sections below map each clause family to a document you can ask for, run the arithmetic on procedures and welder certificates, and mark the place where the standard hands the decision back to your purchase order.
What ISO 3834 controls, in one pass
The series has a structure worth knowing before the certificate arrives. Part 1 gives the criteria for choosing which level applies. Part 2 is comprehensive, part 3 is standard and part 4 is elementary. Part 5 lists the documents a fabricator must have in order to demonstrate conformity, and part 6 gives guidance on implementation. The levels differ in depth of control: how far the fabricator must plan, record and verify, not how good the weld has to be.
Inside part 2, the clauses run through the whole route. Technical review of the requirements comes first, because a drawing that cannot be welded as drawn should be challenged before a quotation, not after. Subcontracting is controlled, so a fabricator cannot pass the welding of your part to an unqualified shop without review. Welding personnel and welding coordination are named and qualified. Equipment is maintained, and measuring equipment is calibrated.
Production planning, work instructions and the welding procedure specifications follow. Consumables are stored, dried and issued against a record. Parent material is stored and identified. Assembly and fit-up are controlled against the drawing. Preheat, interpass and post-weld heat treatment are defined where the procedure calls for them. Inspection is planned before, during and after welding. Records are kept for an agreed period.
That is the chain the certificate certifies. None of it is about your part until someone shows you the records. The standards and compliance hub collects the scope notes for the other standards that sit on the same drawing.
The clause-by-clause evidence a buyer can request
| Clause area | What it requires | Document to request | Ganesh limit or note |
|---|---|---|---|
| Technical review | Feasibility checked against capability before acceptance | Signed review or the RFQ clarification exchange | A weld symbol on a 10 mm joint we cannot reach should come back as a question at quotation |
| Welding coordination | A named coordinator with defined responsibility per ISO 14731 | Appointment letter plus the coordinator's qualification certificate | Ask for the name; it is a person, not a department |
| Welding procedures | A WPS per joint type, thickness and process, supported by a procedure test | WPS number per joint, with the WPQR report behind it | Fusion welding only; spot welding follows ISO 14554 |
| Welder qualification | Welders qualified to ISO 9606-1, operators to ISO 14732 | Certificate with process, position and thickness range, plus the 6-monthly confirmation | A certificate is not a licence to weld any thickness |
| Equipment | Machines suitable and maintained; measuring equipment calibrated | Maintenance plan and the calibration sticker on the set and the gauge | Robot programs are the procedure; a parameter change is a procedure change |
| Consumables | Storage, drying and issue control with batch records | Consumable issue record and drying log | Wire and gas batch matter more on 1.5 mm sheet than on 6 mm plate |
| Material traceability | Heat number carried from goods-in to the finished part | Mill certificate to EN 10204 3.1 and the marking on the part | A 3.1 certificate for CRCA, with heat numbers still readable after coating |
| Preparation and assembly | Fit-up, cleanliness and dimensional control before the arc starts | Fit-up check record and the fixture identification | Fixture design is in-house; gap is the largest cause of excess penetration |
| Inspection and testing | Planned checks before, during and after welding | ITP with hold points, and the visual report to ISO 17637 | Volumetric testing must be priced at RFQ, not added later |
| Records | Quality records kept for an agreed period | The record pack index and retention period | Agree the period in the PO; five years is common, ten appears on rail work |
Reading the table as a checklist changes the audit conversation. Instead of asking whether the shop holds a certificate, you ask for ten documents and see which ones exist for the part in front of you.
The arithmetic: procedures, welders and records
Procedure coverage is where buyers over-specify and fabricators over-test. Take a product family in CRCA at 1.5 mm, 3 mm and 6 mm, with one fillet joint and one butt joint per part. The naive answer is six procedure tests, one per thickness and joint combination.
The thickness rule in ISO 15614-1 does the work instead. A procedure qualified on a 6 mm test piece typically covers production from 3 mm to 12 mm in the same material group and process. One 6 mm butt test and one 6 mm fillet test therefore cover both the 3 mm and 6 mm production thicknesses. That is two procedure tests and two WPQR reports, with four WPS documents written from them for the four joint and thickness combinations in range. Only the 1.5 mm work, below the qualified range, needs its own test.
Welder certificates behave the same way but expire on a clock. An ISO 9606-1 certificate is valid for two years, and it stays valid only while the employer confirms every six months that the welder has been working in that process and position. On a shop with 30 manual stations, each operator holding one certificate, that is 30 certificates and 120 confirmation signatures across a two-year cycle, or 60 signatures a year. Stagger the renewal dates and it is 15 renewals a year rather than 30 in one month.
The record arithmetic matters at audit. If a certificate lapsed because nobody welded that position for six months, the welds made in the gap are not covered by a qualified welder, and no amount of dimension checking fixes that. It is the cheapest failure in the whole system to prevent and the most expensive to discover.
Volume changes the paperwork, not the rules. A 40-part order with three joints per part is 120 weld records, and a record pack indexed by serial number is the only version an auditor can follow. The pack does not need to be digital; it needs to be searchable by the two things an inspector has in hand, which are the part serial and the joint number on the drawing.
What the certificate scope does and does not say
A welding certificate is issued against a scope, and the scope is the first thing to read. It names the processes the fabricator is qualified for, the product types or material groups, and the locations covered. A certificate written for manual MIG on steel does not cover a robotic cell commissioned after the audit until the certification body has seen it, and a certificate issued for one plant does not automatically cover a second unit across town.
The certificate also has a cycle. Certification is maintained by surveillance, usually annual, and the surveillance looks at the system rather than at your order. That is why a fabricator can hold a valid certificate and still produce a non-conforming weld: the certificate says the controls exist, and the record pack says whether they were applied to the part in the crate.
There is a second, sharper question for safety-related work. Some product regimes, such as pressure equipment, qualify the manufacturer against the directive and not only against ISO 3834. In that case the certificate is one input to a manufacturer qualification, and the notified body or the customer's inspector will ask for the welding procedure and the welder records regardless of the certificate. Ask which regime governs before you ask which certificate exists.
Choosing between part 2, part 3 and part 4
The choice follows from consequence, not from ambition. Part 4, elementary, is for fabrication where a weld failure would be noticed and corrected without harm: guards, covers, non-structural bracketry, general sheet-metal assemblies. Part 3, standard, suits general structural and enclosure work where the weld carries load but is not in a critical detail. Part 2, comprehensive, is for work where the weld is the reason the part exists: dynamic loading, sealing, pressure, lifting equipment, or any product where a failure is a safety event.
EN 1090-2 gives the mapping for structural steelwork. Its execution classes align with the parts, with EXC2 aligning to ISO 3834-3 and EXC3 and EXC4 to ISO 3834-2. If a project names an execution class, the welding part follows automatically, which is why an enquiry that names only the certificate often comes back with a scope question.
The cost of the higher part is documentation, coordination time and audit days. On a 500-piece bracket order the difference between part 3 and part 2 is mostly paperwork and a named coordinator, and it buys control over the process that makes the bracket. On a one-off prototype the same paperwork is disproportionate, and part 4 with a clear inspection plan is the honest specification.
Where ISO 3834 stops, and what replaces it
The standard does not set acceptance limits for imperfections. ISO 5817 does that, with quality levels B, C and D and limits that change with thickness. Writing ISO 3834 on a drawing without a level leaves the weld ungraded.
It does not set the extent of inspection. The fabricator must plan inspection, but how much radiography or ultrasonic testing to run comes from the product standard, ISO 17635 and the contract. A part can be fully conforming to ISO 3834 and still be inspected to a level nobody agreed.
It does not cover resistance welding, which is ISO 14554, and that matters on sheet-metal enclosures where spot welding carries the panel to the frame. It does not calculate strength: design is the drawing's job, or the design code's. It does not cover coating, packing or marking except where the weld record needs to travel with the part.
What replaces the missing pieces is a short specification attached to the order: the welding part, the acceptance level, the inspection method and percentage, the material certificate grade, the record retention period, and the customer's right to witness specified hold points. Ten lines, agreed before the first part.
What Ganesh runs, and what the records show
Repeat welded assemblies run on three CLOOS robotic MIG cells, with fixtures designed and built in-house. On a robot the procedure is the program: travel speed, angle, stick-out and sequence repeat on every part, which is what makes a level C porosity and undercut callout hold without a repair loop. More than 30 manual MIG/MAG, spot and special-purpose stations cover the larger frames, the low-volume work and the positions the cell cannot reach.
Parts are cut on a 12 kW fibre laser with a 40 ft × 16 ft bed, formed on the 200 T, 5-axis brake with a 4,450 mm bed, and assembled in fixtures that are checked before the run. Certification is ISO 9001:2015 and ISO 14001:2015. PPAP and first article inspection are available, and a first article for a welded assembly can include the weld map, the visual inspection record and the dimensional report.
Customer work includes elevator frames for TKE and Eros Elevators and base frames and canopy structures for Mahindra Powerol. If your order names a welding part, raise it with the enquiry so the procedure list, the welder coverage and the audit date are planned together rather than discovered at first article. The welded assemblies capability sets out the cell and station range.
What to put on the drawing and the purchase order
- The welding quality part, written as ISO 3834-2, -3 or -4, and the execution class if EN 1090-2 applies.
- The acceptance level from ISO 5817, per joint family, rather than one level for the whole drawing.
- The inspection method and percentage, with the stage at which each hold point is witnessed.
- The material certificate grade, EN 10204 3.1 where heat traceability is needed, and where the heat number must remain visible.
- The weld symbols to ISO 2553 with size and finish, so the procedure can be matched to the joint without a site visit.
- The record pack contents and the retention period, and whether the customer signs the first article.
- Any welding position or access constraint, because a joint that cannot be reached is a design change, not a welding problem.
- The surfaces that must stay bare for earthing or a sliding fit if coating follows the weld.
The welding inspection and traceability guide covers the record set in more depth, and robotic welding for repeat assemblies explains what changes when the procedure lives in a robot program. Send the drawing, the joint list and the standard that governs the part through the quotation route and the procedure and inspection plan come back with the price.
Frequently asked questions
What is the difference between ISO 3834-2, -3 and -4?
Part 2 is comprehensive, part 3 is standard and part 4 is elementary. The difference is the depth of control and documentation a fabricator must keep, not the weld acceptance limits. Most structural work specifies part 2 or 3, and part 4 suits non-critical fabrication.
Does ISO 3834 certification mean the welds are good?
No. It means the fabricator has a system for qualifying procedures, welders and equipment and keeping records. The weld itself is graded against ISO 5817 or a product standard, and the extent of inspection still comes from the purchase order.
What documents should I ask a fabricator for?
For each joint: the WPS number, the supporting WPQR test report, the welder or operator certificate with its position and thickness range, the mill certificate to EN 10204 3.1, and the visual inspection record to ISO 17637. Five documents tie one weld to one procedure and one person.
Is ISO 3834 the same as ISO 9001?
No. ISO 9001 covers the quality management system across the business; ISO 3834 covers welding specifically, down to consumable storage, preheat and traceability by heat number. A company can hold ISO 9001 and still have no welding coordination in the sense ISO 14731 defines.
Which ISO 3834 part does EN 1090-2 require?
EN 1090-2 ties execution classes to the parts: EXC2 aligns with ISO 3834-3 and EXC3 and EXC4 with ISO 3834-2. If the project names an execution class, the welding part follows from it, so put both on the enquiry.
Does ISO 3834 cover spot welding?
No. It covers fusion welding of metallic materials. Resistance welding, including the spot welding used on panels and enclosures, is covered by ISO 14554, which sets its own quality requirements, so specify it separately.
Sources and further reading
- ISO 3834-2:2021 — Quality requirements for fusion welding of metallic materials, part 2: comprehensive quality requirements, workshops and field installation sites · reviewed 3 Nov 2026
- ISO 5817:2023 — Quality levels for imperfections in fusion-welded joints, which supplies the acceptance limits ISO 3834 does not contain · reviewed 3 Nov 2026
- ISO 2553:2019 — Symbolic representation of welded joints on drawings, the route by which a WPS and a joint number meet on the shop floor · reviewed 3 Nov 2026
Does your purchase order name ISO 3834?
Send the drawing, the joint types and the part or standard that applies. We return the procedure list, the welder qualification coverage and the records that will travel with the first article.