OEM sheet metal supplier audit checklist

A supplier audit is not a tour. It is a set of questions with evidence behind them, asked in an order that lets you stop early if the answers are weak. This checklist is structured so that each section can be scored pass, conditional or fail.

How to use it

Score each line with evidence, not impression. "Do you have a quality system?" is not a question; "show me the last three internal audit reports and the corrective actions that came out of them" is. If a supplier cannot produce a document during the visit, treat it as absent.

Section 1 — Process capability

What machines exist, what is their condition, and what tolerance can they actually hold on the part family you are buying? Ask for a first article report from a comparable part, not a capability brochure. Check that the press tonnage, brake length and laser bed match the drawing you sent, not the largest machine on site.

Section 2 — Tooling control

Who owns the tool, where is it stored, how is it maintained, and what is the record? A supplier who cannot show a tool maintenance log is telling you the tool will fail without warning. Ask to see a die being set and a first-off check.

Section 3 — Quality system and inspection

Look for a calibration register, a gauge R&R where measurement matters, non-conformance records and a corrective action loop that closed. Ask how a dimensional non-conformance is quarantined.

Section 4 — Coating and finish

If coating is in scope, ask for the pretreatment line chemistry records, DFT measurement records, adhesion test results and the salt-spray scope. If coating is subcontracted, ask who does it and how it is controlled.

Section 5 — Documentation and traceability

Mill certificates linked to the batch, first article reports, PPAP where required, packing lists and a certificate of conformity. Ask to trace one shipped batch back to the heat number.

Section 6 — Capacity and commercial

What is the current loading, what is the lead time at peak, what happens in a capacity crunch, and who is the escalation contact? A supplier with no capacity answer is a risk regardless of quality.

The checklist

  • Machine list matches the part family, not just the brochure
  • Condition of the presses, brakes and laser verified on the floor
  • First article report from a comparable part reviewed
  • Tool ownership and storage location confirmed
  • Tool maintenance records reviewed
  • Die set and first-off check observed
  • Calibration register current
  • Gauge R&R available for critical measurements
  • Non-conformance and quarantine process observed
  • Corrective action loop closed on a real example
  • Pretreatment chemistry records reviewed
  • DFT measurement records reviewed
  • Adhesion test method and results reviewed
  • Salt-spray scope and hours stated
  • Subcontracted operations identified and controlled
  • Mill certificates linked to batch
  • First article report signed and dated
  • PPAP scope agreed where required
  • Certificate of conformity issued per shipment
  • One batch traced back to heat number
  • Packing method and protection specified
  • Current loading and lead time stated
  • Peak capacity plan described
  • Escalation contact named
  • ISO 9001 certificate scope checked (not just the logo)
  • ISO 14001 or environmental compliance evidence
  • Insurance and export documentation capability
  • Payment terms and currency agreed
  • Sample and approval process defined
  • Review date set for the next audit

Have the pack ready?

Send the drawing, material, finish and quantity. The manufacturability note comes back in writing before the quote.