How to use it
Score each line with evidence, not impression. "Do you have a quality system?" is not a question; "show me the last three internal audit reports and the corrective actions that came out of them" is. If a supplier cannot produce a document during the visit, treat it as absent.
Section 1 — Process capability
What machines exist, what is their condition, and what tolerance can they actually hold on the part family you are buying? Ask for a first article report from a comparable part, not a capability brochure. Check that the press tonnage, brake length and laser bed match the drawing you sent, not the largest machine on site.
Section 2 — Tooling control
Who owns the tool, where is it stored, how is it maintained, and what is the record? A supplier who cannot show a tool maintenance log is telling you the tool will fail without warning. Ask to see a die being set and a first-off check.
Section 3 — Quality system and inspection
Look for a calibration register, a gauge R&R where measurement matters, non-conformance records and a corrective action loop that closed. Ask how a dimensional non-conformance is quarantined.
Section 4 — Coating and finish
If coating is in scope, ask for the pretreatment line chemistry records, DFT measurement records, adhesion test results and the salt-spray scope. If coating is subcontracted, ask who does it and how it is controlled.
Section 5 — Documentation and traceability
Mill certificates linked to the batch, first article reports, PPAP where required, packing lists and a certificate of conformity. Ask to trace one shipped batch back to the heat number.
Section 6 — Capacity and commercial
What is the current loading, what is the lead time at peak, what happens in a capacity crunch, and who is the escalation contact? A supplier with no capacity answer is a risk regardless of quality.
The checklist
- Machine list matches the part family, not just the brochure
- Condition of the presses, brakes and laser verified on the floor
- First article report from a comparable part reviewed
- Tool ownership and storage location confirmed
- Tool maintenance records reviewed
- Die set and first-off check observed
- Calibration register current
- Gauge R&R available for critical measurements
- Non-conformance and quarantine process observed
- Corrective action loop closed on a real example
- Pretreatment chemistry records reviewed
- DFT measurement records reviewed
- Adhesion test method and results reviewed
- Salt-spray scope and hours stated
- Subcontracted operations identified and controlled
- Mill certificates linked to batch
- First article report signed and dated
- PPAP scope agreed where required
- Certificate of conformity issued per shipment
- One batch traced back to heat number
- Packing method and protection specified
- Current loading and lead time stated
- Peak capacity plan described
- Escalation contact named
- ISO 9001 certificate scope checked (not just the logo)
- ISO 14001 or environmental compliance evidence
- Insurance and export documentation capability
- Payment terms and currency agreed
- Sample and approval process defined
- Review date set for the next audit